Minimum Surface Casing Requirements


Minimum surface casing requirements for protecting fresh and usable water and to meet alternate #1 on Intent to Drill cards, Form C-1
S=Section, T=Township, R=Range


Ford County

Protect through the Dakota formation plus 20 feet into the underlying formation except where known local areas of usable water occur in the Cheyenne sandstone, in which case, protection must be extended 20 feet into the Permian. The following options are open:

(a) set through the Dakota plus 20 feet into the underlying formation or 20 feet into the Permian if specifically designated or
(b) set through all unconsolidated material plus 20 feet into the underlying formation and cement the production string from a point 20 feet below the base of the Dakota or 20 feet below the base of the Cheyenne, if specifically designated, to the surface.

If (b) is used and the hole is dry, refer to K.A.R. 82-3-114. In all cases, set through all unconsolidated material plus 20 feet into the underlying formation.